Our Location
5th Floor, Huake Center, Lanshan District, Linyi City, Shandong Province, China

The stack that stays inside the building line runs without the preservative, and structural plywood untreated names the rated sheet that carries the framing load but carries no added treatment against the decay. The stamp still reads the span while the dry service keeps the panel out of the damp. This guide reads the class, the duty, and the seal that the untreated panel asks for.
The untreated panel carries the rating without the treatment, because the crossed veneers still share the bending while the preservative is left off the fibre. The stamp leads the order. Read the rating against the drawing.
The stamp names the framing spacing that the sheet bridges at the live load, because the untreated panel still carries the same crossed core that the treated sheet holds. The rated sheet closes the deck. Match the number to the plan and compare the two at the gate, because the stamp that answers the drawing keeps the order honest.
The fibre comes without the added preservative, because the dry protected line never asks the panel for the decay resistance that the open deck needs. The untreated sheet serves the interior. Match the duty to the room.
The covered floor, the interior wall, and the dry frame each read the class against the moisture that the panel never meets, because the sealed line keeps the damp off the fibre. Match each bay against the drawing.
The interior subfloor takes the untreated rated sheet at the joist line because the walking load crosses the span while the covered room keeps the damp off, because the dry deck never reaches the exposure that the treated panel is classed for. Match the depth to the framing.
The interior wall takes the untreated class behind the lining because the dry room keeps the moisture off the edge that the treatment is never asked to answer, because the covered line saves the premium of the treated sheet. Read the exposure against the class and the seal together before the order goes out.
The untreated panel still reads the seal at the cut edge, because the un-treated fibre drinks the moisture that swells the core if the damp ever reaches it. The sealed edge holds the wet out.
Coat every cut edge before the panel is fastened, because the raw strip draws the damp that the sealed face never lets in. Keep the coating off the drainage line. Coat the edge on the bench before the lift.
The face takes the coating the programme asks because the untreated veneer still meets the air and the traffic that the room applies, because the sealed face closes the grain against the damp. Match the finish to the service and the traffic that the surface takes, because the walk line wears faster than the covered wall face.
The two classes separate the dry line from the wet, because the untreated panel serves the covered interior while the treated sheet carries the preservative that the open deck asks. Match the class to the exposure.
The dry protected line takes the untreated sheet because the moisture never reaches the fibre that the preservative would answer, because the sealed room saves the premium of the treated class. Read the exposure before the order goes out.
The open deck takes the treated sheet because the standing water reaches the edge that the untreated fibre would drink, because the treated class holds the decay line. Step the class up to the exposure.
The fastener still reads the framing behind the untreated face, because the screw into the line carries the load while the fixing in the field alone holds the sheet flat. The matched spacing keeps the panel true.
The closer spacing at the panel edge holds the sheet down where the load applies the lift, because the field carries the middle while the edge takes the pull. Keep the fasteners to the schedule. Drill the pilot at the edge plys.
Pre-drill the pilot into the face so the screw enters without the split that the veneer opens along the grain, because the clean hole holds the thread while the forced screw lifts the layer line. Set the head below the face where the hand meets the panel.
Check the delivered stack against the ticket at the gate before the crew stages it, because the mixed pallet carries the treated panel that the interior run should not take. Read the stamp on every sheet as it leaves the stack. Confirm the class before the run starts.
The site cut still reads the blade and the support, because the panel that flexes under the saw leaves the edge that the seam shows along the joint. Set the sheet on the full support before the cut starts, and keep the blade sharp against the resin that the glue line deposits on the teeth through the pass. Score the line on the finished run before the saw starts.
Keep the untreated panel clear of the standing water at the threshold, because the dry line still meets the damp at the door that the wet season brings. Set the fall away from the panel and check the line before the finish closes the room.
The install fails in a few familiar places: the untreated sheet sent to the open deck, the raw edge left to the damp, and the class read as the rating. Each mistake goes back to the exposure rather than the sheet. Read, seal, and match.
An untreated sheet at the open deck drinks the moisture that the treated class holds, so step the panel up to the treated sheet for the wet line. The matched class closes the deck. Read the exposure against the sheet before the delivery.
An untreated edge left raw draws the damp that swells the core, so seal every cut edge before the panel meets the room. The sealed edge holds the wet out. Coat the cut edge before the install happens.
The untreated panel still reads the flat store, because the yard-level damp reaches the bottom sheet before the lift ever happens. Handle the sheet to the dry line through the programme.
Store the sheets on the flat stickers rather than the ground that wicks the damp into the bottom panel, because the stacked sheet stays flat for the run that follows. Keep the cover off the top against the rain while the stickers keep the airflow between the layers. The dry stack feeds the crew without the swollen panel.
These are the questions buyers ask most about the class.
The untreated sheet serves the covered dry line, because the open deck takes the treated class that answers the decay at the wet edge. Match the exposure to the class before the order goes out.
Seal every cut edge and finish the face the programme asks, because the untreated fibre drinks the moisture that the sealed face holds out. Coat the edge before the install.
The treated sheet carries the added preservative for the wet line while the untreated panel serves the dry protected room, because the exposure sets the class that the fibre needs.
The rating reads separately from the treatment, because the untreated sheet still carries the crossed core and the stamp that the drawing asked for. Read the stamp against the plan.
Read the rating, the exposure, and the seal against the drawing, and the structural plywood untreated choice becomes the spec that leads the order rather than the surprise that arrives on the truck. The matched sheet serves the dry line across the floor, the wall, and the covered frame through the programme. When the run needs untreated rated panels, HYY supplies sheets with the rating, bond, and depth marked on every panel, and the Commercial Plywood and Melamine Plywood pages show the stock for the floor and the wall. The complete plywood product range backs the order before the truck is booked.