Our Location
5th Floor, Huake Center, Lanshan District, Linyi City, Shandong Province, China

The wall in the frame carries the Lattenwand, and lattenwand names the slat wall panel that the builder reads at the stack. The panel serves the room and the desk. This guide reads the slat, the acoustic, and the install that the panel serves.
The Lattenwand panel is the slat wall panel, because the spaced slats break the flat plane while the felt backing absorbs the echo. The panel serves the room. Read the panel against the spec.
The slat spacing holds the rhythm that the flat wall lacks, because the gaps between the strips give the eye its line while the wood carries the warmth. The matched spacing closes the backdrop. Keep the gaps even across the run.
The wood tone reads against the room, because the warm grain frames the space while the flat wall fights the light. The matched tone closes the room. Read the colour against the room.
The Lattenwand calms the room, because the felt backing behind the slats absorbs the echo that the flat wall bounces. The acoustic serves the call. Read the backing against the room.
The felt layer behind the slats absorbs the sound that the hard wall reflects, because the soft fibre breaks the echo while the slats hold the line. The matched layer closes the acoustic. Keep the felt clear of the gap.
The echo at the desk falls once the Lattenwand goes up, because the felt backing breaks the reflection while the slats hold the plane. The matched wall calms the call. Read the room against the wall.
The home office, the studio, and the meeting room each read the Lattenwand against the backdrop that the room needs, because the wood frame gives the space its context. Match each room against the plan.
The home office takes the Lattenwand behind the desk, because the wood frame gives the room its calm while the felt absorbs the echo. The matched wall closes the room. Read the tone against the desk.
The studio and the meeting room take the deeper run where the wall crosses the span that the short panel flexes at, because the live load of the long wall asks the fibre at that depth while the slats carry the line. The deep panel holds the plane. Match the depth to the wall.
The cut edge still drinks the moisture that the finished face sheds, because the raw plies at the side take the damp that the sealed face never meets. Seal every cut edge before the install.
Coat every cut edge before the panel is fastened, because the raw strip draws the water that swells the core. Keep the coating off the drainage line. Coat the edge on the bench before the lift.
Cut with the teeth entering the finished face so the exit side stays whole, because the tear at the back shows under the slat that the sealed face transfers. Keep the blade sharp against the wood. Score the line before the pass.
The fastener still reads the framing behind the face, because the screw into the stud carries the load while the fixing in the field alone lets the panel bow. The matched spacing holds the wall.
Pre-drill the pilot into the face so the screw enters without the split that the veneer opens along the grain, because the clean hole holds the thread while the forced screw lifts the layer line. Set the head below the face.
The closer spacing holds the sheet flat where the load presses the panel, because the field carries the middle while the edge takes the pull at the strike. Keep the fasteners to the schedule. Drill the pilot at the edge plies.
The wall fails in a few familiar places: the gaps uneven across the run, the raw edge left to the damp, and the depth short of the span. Each mistake goes back to the surface rather than the panel. Read, seal, and clean.
An uneven gap breaks the rhythm that the Lattenwand carries, so keep the spacing true across the run and check the line before the panel sets. The matched spacing closes the backdrop. Check the gap before the fix.
An edge left raw drinks the damp that the finished face sheds, so seal every cut edge before the install. The sealed edge holds the wall. Coat the edge before the panel lands.
Strike the form once the concrete has set enough to hold, because the early strike tears the cast that the cured face releases clean. Read the cure against the schedule before the panels pull away. Check the face after the strike.
Clean the slat face after the strike so the next cast releases as clean, because the residue and the scratch that stay on the face tear the finish that the panel must transfer. Keep the face clear between the pours.
The form tie carries the pressure across the two faces, because the wet concrete pushes the panels apart that the stud line alone cannot hold. Set the tie at the spacing the form asks. Read the pressure against the tie line.
Store the panels on the flat stickers rather than the ground that wicks the damp into the bottom panel, because the stacked panel stays flat and the finish stays clean for the wall that follows. Keep the cover off the top against the rain and the damp air and the wet and the site and the air and the moisture.
Check the delivered stack against the ticket at the gate before the crew stages it, because the mixed pallet carries the panel that the wall should not take. Read the label on every panel as it leaves the stack. Confirm the finish and the depth before the run starts.
These are the questions builders ask most about the panel.
A Lattenwand is the slat wall panel that sits behind the desk, because the spaced slats break the flat wall while the felt absorbs the echo. Match the tone to the room.
The Lattenwand carries the felt backing that absorbs the echo, because the soft fibre breaks the reflection while the slats hold the line. The matched layer closes the acoustic.
The panel fastens to the stud line at the spacing the load asks, because the screw into the stud carries the wall while the fixing in the field alone lets the panel bow. Keep the fasteners to the schedule.
The oak and the walnut carry the warm grain that the room reads, because the wood tone reads against the space while the flat wall fights the light. Read the colour against the room.
The Lattenwand panel still reads the flat store, because the site-level damp reaches the bottom panel and the stacked face keeps the finish clean. Handle the panel to the dry line through the programme.
Store the panels on the flat stickers rather than the ground that wicks the damp into the bottom panel, because the stacked panel stays flat and the finish stays clean for the wall that follows. Keep the cover off the top against the rain.
Check the delivered stack against the ticket at the gate before the crew stages it, because the mixed pallet carries the panel that the wall should not take. Read the label on every panel as it leaves the stack. Confirm the finish and the depth before the run starts.
Read the slat, the felt, and the room against the plan, and the Lattenwand choice becomes the spec that leads the order rather than the surprise that arrives on the truck. The matched panel closes the wall. When the run needs slat wall, HYY supplies panels with the slat, count, and finish marked on every panel, and the Commercial Plywood and Film Faced Plywood pages show the stock for the wall and the desk. The complete plywood product range backs the order before the truck is booked.