Our Location
5th Floor, Huake Center, Lanshan District, Linyi City, Shandong Province, China

The panel in the stack carries the Chinese name, and chinese plasterboard names the plasterboard from China that the builder reads at the stack. The panel serves the wall and the ceiling. This guide reads the panel, the core, and the face that the panel serves.
The Chinese plasterboard is the plasterboard from China, because the mills press the gypsum into the panel that the builder reads at the stack. The panel serves the wall. Read the panel against the spec.
The gypsum core carries the panel, because the mineral core gives the panel its plane while the paper face carries the finish. The matched core closes the panel. Read the core against the duty.
The paper face carries the finish, because the paper gives the paint its key while the core holds the plane. The matched face closes the wall. Read the face against the finish.
The wall, the ceiling, and the partition each read the Chinese plasterboard against the finish that the room needs, because the paper face transfers the line that the drawing names. Match each use against the plan.
The wall and the partition take the Chinese plasterboard where the load stays light, because the bracing asks the fibre at that depth while the gypsum carries the plane. The thin sheet holds the wall. Match the depth to the frame.
The ceiling and the wet room take the Chinese plasterboard where the moisture runs, because the moisture-resistant core holds the damp while the standard core swells. The matched panel closes the ceiling. Read the panel against the wet room.
The cut edge still drinks the moisture that the paper face sheds, because the raw gypsum at the side takes the damp that the paper never meets. Seal every cut edge before the install.
Coat every cut edge before the panel is fastened, because the raw strip draws the water that swells the core. Keep the coating off the drainage line. Coat the edge on the bench before the lift.
Cut with the teeth entering the paper face so the exit side stays whole, because the tear at the back shows under the finish that the paper transfers. Keep the blade sharp against the gypsum. Score the line before the pass.
The fastener still reads the framing behind the face, because the screw into the stud carries the load while the fixing in the field alone lets the panel bow. The matched spacing holds the wall.
Pre-drill the pilot into the face so the screw enters without the split that the paper opens along the grain, because the clean hole holds the thread while the forced screw lifts the layer line. Set the head below the face.
The closer spacing holds the panel flat where the load presses the sheet, because the field carries the middle while the edge takes the pull at the strike. Keep the fasteners to the schedule. Drill the pilot at the edge plies.
The wall fails in a few familiar places: the moisture class short of the duty, the raw edge left to the damp, and the depth short of the load. Each mistake goes back to the surface rather than the panel. Read, seal, and clean.
A class short of the duty swells the core that the moisture attacks, so keep the moisture-resistant class to the wet run and check the stamp before the install. The matched class closes the wall. Read the class against the duty.
An edge left raw drinks the damp that the paper face sheds, so seal every cut edge before the install. The sealed edge holds the panel. Coat the edge before the panel lands.
Strike the form once the concrete has set enough to hold, because the early strike tears the cast that the cured face releases clean. Read the cure against the schedule before the panels pull away. Check the face after the strike.
Clean the paper face after the strike so the next cast releases as clean, because the residue and the scratch that stay on the face tear the finish that the panel must transfer. Keep the face clear between the pours.
The form tie carries the pressure across the two faces, because the wet concrete pushes the panels apart that the stud line alone cannot hold. Set the tie at the spacing the form asks. Read the pressure against the tie line.
Store the panels on the flat stickers rather than the ground that wicks the damp into the bottom panel, because the stacked panel stays flat and the finish stays clean for the wall that follows. Keep the cover off the top against the rain and the damp air and the wet.
Check the delivered stack against the ticket at the gate before the crew stages it, because the mixed pallet carries the panel that the wall should not take. Read the label on every panel as it leaves the stack. Confirm the class and the depth before the run starts.
Strike the form once the concrete has set enough to hold, because the early strike tears the cast that the cured face releases clean. Read the cure against the schedule before the panels pull away. Check the face after the strike.
Clean the paper face after the strike so the next cast releases as clean, because the residue and the scratch that stay on the face tear the finish that the panel must transfer. Keep the face clear between the pours.
The form tie carries the pressure across the two faces, because the wet concrete pushes the panels apart that the stud line alone cannot hold. Set the tie at the spacing the form asks. Read the pressure against the tie line.
Store the panels on the flat stickers rather than the ground that wicks the damp into the bottom panel, because the stacked panel stays flat and the finish stays clean for the wall that follows. Keep the cover off the top against the rain and the damp air and the wet.
Check the delivered stack against the ticket at the gate before the crew stages it, because the mixed pallet carries the panel that the wall should not take. Read the label on every panel as it leaves the stack. Confirm the class and the depth before the run starts.
These are the questions builders ask most about the panel.
Chinese plasterboard is the plasterboard from China, because the mills press the gypsum into the panel that the builder reads at the stack. Match the panel to the room.
The standard Chinese plasterboard is not waterproof, because the core drinks the water while the moisture-resistant class holds the damp. Keep the standard panel to the dry run.
The panel comes from China, because the country hosts the plasterboard cluster that serves the export trade. Read the origin against the order.
The grades run from standard to moisture-resistant, because the core answers the moisture while the face grade answers the finish. Read the grade against the room.
The Chinese plasterboard still reads the flat store, because the site-level damp reaches the bottom panel and the stacked face keeps the finish clean. Handle the panel to the dry line through the programme.
Store the panels on the flat stickers rather than the ground that wicks the damp into the bottom panel, because the stacked panel stays flat and the finish stays clean for the wall that follows. Keep the cover off the top against the rain.
Check the delivered stack against the ticket at the gate before the crew stages it, because the mixed pallet carries the panel that the wall should not take. Read the label on every panel as it leaves the stack. Confirm the class and the depth before the run starts.
Read the panel, the core, and the room against the plan, and the Chinese plasterboard choice becomes the spec that leads the order rather than the surprise that arrives on the truck. The matched panel closes the wall. When the run needs plasterboard, HYY supplies panels with the core, count, and finish marked on every panel, and the Commercial Plywood and Film Faced Plywood pages show the stock for the wall and the ceiling. The complete plywood product range backs the order before the truck is booked.