Our Location
5th Floor, Huake Center, Lanshan District, Linyi City, Shandong Province, China

The small room in the frame carries the 2×2 sheet, and 2×2 gypsum board PVC paper names the small plasterboard sheet whose PVC face carries the finish. The sheet serves the small room and the patch. This guide reads the sheet, the PVC face, and the install that the panel serves.
The 2×2 sheet is the small plasterboard panel, because the compact size fits the small room and the patch while the gypsum core holds the plane. The sheet serves the repair. Read the size against the room.
The compact size fits the small room and the patch, because the 2×2 footprint covers the hole while the full sheet wastes the cut. The matched size closes the repair. Keep the size to the patch.
The gypsum core holds the plane and the fire rating, because the mineral core carries the load while the paper face carries the finish. The matched core closes the wall. Read the core against the duty.
The PVC paper face carries the finish that the gypsum core cannot, because the PVC surface gives the paint its key while the core holds the plane. The face serves the room. Read the face against the finish.
The PVC surface gives the paint its key, because the plastic face holds the coat while the paper absorbs the moisture. The matched surface closes the finish. Keep the surface clean before the paint.
The paper backing holds the gypsum core, because the paper wraps the mineral while the PVC face carries the finish. The matched backing closes the sheet. Read the backing against the core.
The small room, the patch, and the repair each read the 2×2 sheet against the finish that the room needs, because the compact size covers the hole while the PVC face carries the coat. Match each use against the plan.
The small room takes the 2×2 sheet where the full sheet wastes the cut, because the compact footprint covers the wall while the PVC face carries the finish. The matched sheet closes the room. Read the size against the wall.
The patch and the repair take the 2×2 sheet where the hole needs closing, because the compact size fits the gap while the PVC face carries the coat. The matched sheet closes the repair. Read the size against the hole.
The cut edge still drinks the moisture that the PVC face sheds, because the raw gypsum at the side takes the damp that the face never meets. Seal every cut edge before the install.
Coat every cut edge before the sheet is fastened, because the raw strip draws the water that swells the core. Keep the coating off the drainage line. Coat the edge on the bench before the lift.
Cut with the teeth entering the PVC face so the exit side stays whole, because the tear at the back shows under the finish that the face transfers. Keep the blade sharp against the gypsum. Score the line before the pass.
The fastener still reads the framing behind the face, because the screw into the stud carries the load while the fixing in the field alone lets the sheet bow. The matched spacing holds the wall.
Pre-drill the pilot into the face so the screw enters without the split that the paper opens along the grain, because the clean hole holds the thread while the forced screw lifts the layer line. Set the head below the face.
The closer spacing holds the sheet flat where the load presses the panel, because the field carries the middle while the edge takes the pull at the strike. Keep the fasteners to the schedule. Drill the pilot at the edge plys.
The wall fails in a few familiar places: the moisture class short of the duty, the raw edge left to the damp, and the size short of the patch. Each mistake goes back to the surface rather than the sheet. Read, seal, and clean.
A class short of the duty swells the core that the moisture attacks, so keep the moisture-resistant class to the wet run and check the stamp before the install. The matched class closes the wall. Read the class against the duty.
An edge left raw drinks the damp that the PVC face sheds, so seal every cut edge before the install. The sealed edge holds the sheet. Coat the edge before the panel lands.
Strike the form once the concrete has set enough to hold, because the early strike tears the cast that the cured face releases clean. Read the cure against the schedule before the panels pull away. Check the face after the strike.
Clean the PVC face after the strike so the next cast releases as clean, because the residue and the scratch that stay on the face tear the finish that the sheet must transfer. Keep the face clear between the pours.
The form tie carries the pressure across the two faces, because the wet concrete pushes the panels apart that the stud line alone cannot hold. Set the tie at the spacing the form asks. Read the pressure against the tie line.
Store the sheets on the flat stickers rather than the ground that wicks the damp into the bottom panel, because the stacked sheet stays flat and the finish stays clean for the wall that follows. Keep the cover off the top against the rain.
Check the delivered stack against the ticket at the gate before the crew stages it, because the mixed pallet carries the panel that the wall should not take. Read the label on every sheet as it leaves the stack. Confirm the class and the depth before the run starts.
These are the questions builders ask most about the sheet.
The 2×2 gypsum board PVC paper is the small plasterboard sheet whose PVC face carries the finish, because the compact size fits the small room and the patch. Match the size to the hole.
The PVC face resists the moisture while the gypsum core drinks the water, because the plastic surface sheds the damp while the mineral core swells. Keep the standard sheet to the dry run.
The 2×2 size fits the patch and the repair, because the compact footprint covers the hole while the full sheet wastes the cut. Match the size to the hole.
The PVC paper carries the plastic surface that sheds the damp while the standard paper absorbs the moisture, because the two faces serve different rooms at the same core. Read the face against the room.
The 2×2 sheet still reads the flat store, because the site-level damp reaches the bottom panel and the stacked face keeps the finish clean. Handle the sheet to the dry line through the programme.
Store the sheets on the flat stickers rather than the ground that wicks the damp into the bottom panel, because the stacked sheet stays flat and the finish stays clean for the wall that follows. Keep the cover off the top against the rain.
Check the delivered stack against the ticket at the gate before the crew stages it, because the mixed pallet carries the panel that the wall should not take. Read the label on every sheet as it leaves the stack. Confirm the class and the depth before the run starts.
Read the size, the face, and the room against the plan, and the 2×2 gypsum board PVC paper choice becomes the spec that leads the order rather than the surprise that arrives on the truck. The matched sheet closes the wall. When the run needs plasterboard, HYY supplies panels with the core, count, and finish marked on every sheet, and the Commercial Plywood and Film Faced Plywood pages show the stock for the wall and the ceiling. The complete plywood product range backs the order before the truck is booked.